24-Hour Emergency Asbestos Removal —Call 07345 062075
Commercial · Maidstone, Kent

Refurbishment & Demolition Survey — Former Warehouse, Maidstone

Seven ACMs identified across a 3,500 sq ft 1960s warehouse. Full R&D survey report, phased removal specification, and six-week removal programme delivered — demolition commenced on programme.

Location
Maidstone, Kent
Date
March 2025
Duration
3-day survey + 6-week removal
ACM Type
Multiple — cement roofing, AIB, pipe lagging, floor tiles
Client
Property developer (residential conversion)
Project Overview

A Pre-Demolition Survey That Uncovered Seven ACMs

Commercial and industrial buildings constructed between the 1940s and 1980s present a significantly higher asbestos risk than domestic properties. Asbestos was used extensively in commercial construction — not just in roofing and cladding, but in insulation, partition systems, floor finishes, pipe lagging, and mechanical plant. A building of this age and type will almost always contain multiple ACMs, and a refurbishment or demolition survey is a legal requirement before any significant works can commence.

This Maidstone warehouse was a typical example: a 1960s single-storey industrial building with a mix of asbestos cement roofing, AIB partitions, and mechanical plant insulation. The developer had correctly identified the need for a full R&D survey before instructing the demolition contractor, and had allowed sufficient programme time for the survey and removal works.

The project was completed on programme and within budget. The developer has since instructed us on two further Kent commercial projects.

Before & After
Loading comparison…
R&D Survey In Progress vs Survey Complete — ACM Register Issued — after
R&D Survey In Progress vs Survey Complete — ACM Register Issued — before
R&D Survey In Progress
Survey Complete — ACM Register Issued
Before: R&D Survey In ProgressAfter: Survey Complete — ACM Register Issued

Maidstone warehouse: 7 ACMs identified across 3,500 sq ft. Full R&D survey report and ACM register issued within 5 working days.

Why a Refurbishment & Demolition Survey Is a Legal Requirement

Under Regulation 7 of the Control of Asbestos Regulations 2012, a refurbishment and demolition survey must be carried out before any work that disturbs the fabric of a building. This applies to all commercial and industrial buildings, regardless of age. Proceeding with demolition or refurbishment without a survey — or with an inadequate survey — exposes the developer, principal contractor, and principal designer to enforcement action by the HSE, potential prosecution, and unlimited liability for any asbestos-related illness arising from the works.

Project Timeline

Survey, Specification & Removal — How It Was Done

01

Pre-Survey Briefing & Site Assessment

The developer had acquired a former 3,500 sq ft warehouse in Maidstone with planning permission for a residential conversion of 12 units. Before demolition could commence, a full refurbishment and demolition survey was required under the Control of Asbestos Regulations 2012. The building had been constructed in the 1960s and had not been surveyed previously. Our P402-qualified surveyor attended for a pre-survey walkthrough with the developer's project manager to agree access arrangements for all areas including the roof void, basement plant room, and service ducts.

Pre-Survey Briefing & Site Assessment
02

Three-Day Intrusive Survey

The survey took three days to complete. All accessible and inaccessible areas were inspected, with intrusive access made to the roof void via loft hatches, the basement plant room via a confined space entry procedure, and all partition walls via drill sampling. Seven distinct ACMs were identified: asbestos cement roofing sheets (large quantity, roof level), asbestos insulation board partition panels (office area), pipe lagging on the heating system (plant room), asbestos floor tiles in the office area, asbestos rope seals on the boiler, an asbestos cement flue pipe, and loose-fill asbestos insulation in a section of the roof void. All ACMs were sampled and submitted to our UKAS-accredited laboratory.

Three-Day Intrusive Survey
03

Survey Report, Removal Specification & Cost Plan

Laboratory results were returned within 24 hours, confirming the ACM types and asbestos content. Our full R&D survey report was delivered to the developer within five working days of the survey completion. The report included the asbestos register, condition ratings, risk assessments, and a phased removal specification that sequenced the works to allow the demolition contractor to begin on the agreed programme. A detailed cost plan was prepared for the developer's quantity surveyor.

04

Phased Removal Programme — Six Weeks

Our licensed removal team carried out the full phased programme over six weeks. The works were sequenced to clear the highest-risk ACMs first: the loose-fill insulation in the roof void (licensed work, negative-pressure enclosure required), followed by the AIB partition panels, pipe lagging, and floor tiles. The asbestos cement roofing and flue were removed last, as non-licensed notifiable work. All waste was transported to a licensed disposal facility under consignment notes.

Phased Removal Programme — Six Weeks
05

Final Clearance Certificate & Demolition Handover

On completion of the removal programme, a final clearance certificate was issued confirming the building was free of all identified ACMs. The certificate was accepted by the demolition contractor's principal designer and the local authority building control officer. Demolition commenced on the agreed programme date. The developer subsequently instructed us to carry out the management surveys for the completed residential units.

Full Scope of Works

Everything Delivered on This Project

Full intrusive R&D survey — 3,500 sq ft warehouse
Roof void, service ducts, basement plant room surveyed
Seven distinct ACMs identified and sampled
UKAS-accredited laboratory analysis within 24 hours
Full R&D survey report delivered within 5 working days
Phased removal specification and cost plan produced
Licensed contractor requirement schedule prepared
Full phased removal programme — 6 weeks
Final clearance certificate issued
Demolition contractor commenced on schedule
Commercial Asbestos Survey in Kent?

We carry out R&D surveys, management surveys, and full removal programmes for commercial and industrial properties across Kent.

Get a Free Quote07345 062075
Project Facts
Location
Maidstone, Kent
Property Type
1960s industrial warehouse
ACMs Found
7 distinct ACMs
Survey Duration
3 days
Removal Duration
6 weeks
Client Type
Property developer
Outcome
Demolition commenced on programme
Our Credentials
ARCA Member Asbestos Contractor
UKATA P402 Qualified Surveyors
UKAS-Accredited Laboratory Partner
Licensed Waste Carrier

Commercial Asbestos Surveys Across Kent

We cover Maidstone, Medway, Sevenoaks, Dartford, and all of Kent for commercial and industrial asbestos surveys and removal. Free quotes, rapid turnaround.

Ready to book your asbestos demolition survey?

HSE licensed · UKATA certified · Free no-obligation quote